Commercial generator & critical power
Critical power projects without fragmented accountability.
Facility Recovery Group coordinates the moving parts around commercial generator and critical-power transitions—especially larger 50 kW+ systems—while appropriately qualified partners perform specialized or licensed scopes.
The scope
From a single standby generator to multi-site critical-power assets, we build the project around operational continuity, safe sequencing, asset value, and a clear end state.
Scope this projectTypical coordination can include
Site and equipment assessment
Project scope and sequencing
Removal, logistics, and rigging coordination
Fuel-system and environmental work coordination
Remarketing, reuse, recycling, or disposal pathways
Documentation and final-condition closeout
What this protects
Operational clarity
at every handoff.
Reduce internal project-management load
Make disposition decisions before demolition pressure rises
Keep responsibilities, handoffs, and timing visible
Qualified execution, accountable coordination.
Facility Recovery Group defines, sequences, and coordinates the transition. Where a scope requires a licensed or specialized trade, that work is performed by an appropriately qualified project partner.
Commercial maintenance referral
Need ongoing generator service instead?
If your need is routine maintenance rather than a transition project, send us the basics. We can help make an appropriate commercial-service introduction.